![]() Signet provided off-site structural steel fabrications inspections and triple shift on-site structural steel welding inspections. The annex portion had End-line supplied seismic dampers installed in the walls required fabrication inspection in Chicago, Illinois and Buffalo, New York. ![]() The project was on a time critical schedule demanding the provision and management of appropriate staff on a round-the-clock basis. 20,000 drilled-in dowels were placed during the retrofit. The major seismic retrofit designed by EQE International was a fast tracked project which consisted of extensive concrete, shotcrete and structural steel applications. ![]() The War Memorial Opera House is a 333,000 square feet building originally completed in 1936. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |